微信jiashangqulemei
 

双色球专家预测荐汇总:产品检验报告英文翻译

发布时间:2013-08-05 18:33:44
 

广西11选5计算器 www.d6hg.cn 产品检验报告英文翻译,产品呢检测报告翻译模板,产品出口检测书必须正规分哪一机构翻译,改翻译章

产品检测报告英文版

Test Report

 

No.:201305AC196

 

Sample Name: extruded sheet

 

Client:BeijingJinyuntian New Thermal Insulation Building Materials Co. , Ltd

 

Test Type: sampling inspection

 

产品检测报告英文版 

ChinaBuildingMaterials Industrial Technology Supervision andResearchCenter

 

ChinaBuildingMaterialsIndustryCenterfor Quality Supervision and Inspection of Dry-mixed Mortar

 

 

 

 

 

ChinaBuildingMaterials Industrial Technology Supervision andResearchCenter

ChinaBuildingMaterialsIndustryCenterfor Quality Supervision and Inspection of Dry-mixed Mortar

 

Test Report

No.:201305AC196                                   Pages: 1/3

Name of product

Extruded sheet

Type of inspection

Sampling inspection

Client

BeijingJinyuntian New Thermal Insulation Building Materials Co. , Ltd

Date of production

January, 2013

Production unit

BeijingJinyuntian New Thermal Insulation Building Materials Co. , Ltd

Specifications

(600×1200×80)mm

Sampling place

Enterprisefinished-product warehouse

Trademark

________

Sampling person

Chen Jiayu    Su Liang

Grade

Grade B2

Date of sampling

May 21st 2013

Quantity of sampling

8 pieces

Status of sample

Clintheriform, in good condition

Base of sampling

20m3

Sampling unit

ChinaBuildingMaterialsIndustryCenterfor Quality Supervision and Inspection of Dry-mixed Mortar

Basis for inspection

GB/T 10801.2-2002 Extruded Polystyrene Foam Insulation Board (XPS)

GB/T 10801.1-2002 expanded Polystyrene Foam Insulation Board

Inspection items

1. Appearance quality 2. Allowable variation  3. Compression strength  4. Water absorption  5. Moisture permeance factor   6. Heat conductivity coefficient   7. Thermal resistance  8. Dimensional stability   9. Combustion performance   10. apparent density

Inspection conclusion

*Through inspection, the inspection results of the appearance quality, allowable variation, compression strength, water absorption, moisture permeance factor, heat conductivity coefficient, dimensional stability and the combustion performance comply with the technical requirements of X150 of GB/T 10801.2-2002. The inspection is conducted according to the test method provided in the Standard GB/T 10801.1-2002. Please refer to the inspection result of apparent density in Page 3. *

 

Date of issuance: June 18th 2013

 

(Official Inspection and Test Stamp of China Building Materials Industry Center for Quality Supervision and Inspection of Dry-mixed Mortar)

Remarks: (blank here)

Approved by:         Reviewed by:           Made by:

Address of inspection unit: North Building of China Building Materials, Guangzhuang, Chaoyang District, Beijing    Tel: 010-51164723   Postal code: 100024

ChinaBuildingMaterials Industrial Technology Supervision andResearchCenter

ChinaBuildingMaterialsIndustryCenterfor Quality Supervision and Inspection of Dry-mixed Mortar

 产品检测报告英文版

Test Report

No.:201305AC196                                   Pages: 2/3

No.

Inspection items

Requirements

(X150)

Inspection results

Conclusion

1

Appearance quality

Smooth surface without impurities; uniform color; has no visible defects that obviously affect the usage, for example, foam, breach and deformation, etc

Smooth surface without impurities; uniform color; has no visible defects, for example, foam, breach and deformation, etc

Qualified

2

Allowable variation

Length (1000≤L<2000)

±7.5

-2~+3

Qualified

L<1000

±5

-2~+2

Qualified

H≥50

±3

0~+1

Qualified

1000≤T<2000

≤7

3

Qualified

3

Compression strength, kPa

≥150

160

Qualified

4

Water absorption (soaked in water 96h), %

≤1.5

0.91

Qualified

5

Moisture permeability factor, ng/(ms.Pa) (23℃, RH50%)

≤3.5

2.2

Qualified

6

Thermal conductivity

W/(m.K)

Average temperature10℃

≤0.028

0.027(average temperature10.00℃)

Qualified

Average temperature25℃

≤0.030

0.029(average temperature25.00℃)

Qualified

Remarks: (blank below)

Address of inspection unit: North Building of China Building Materials, Guangzhuang, Chaoyang District, Beijing    Tel: 010-51164723   Postal code: 100024

             

 产品检测报告英文版 

ChinaBuildingMaterials Industrial Technology Supervision andResearchCenter

ChinaBuildingMaterialsIndustryCenterfor Quality Supervision and Inspection of Dry-mixed Mortar

 

Test Report

No.:201305AC196                                   Pages: 3/3

No.

Inspection items

Requirements

(X150)

Inspection results

Conclusion

7

Thermal resistance (m2.K)/W (thickness25mm)

Average temperature10℃

≥0.89

0.92 (average temperature10.00℃)

Qualified

Average temperature25℃

≥0.83

0.86 (average temperature25.00℃)

Qualified

8

Dimensional stability, % (70℃±2℃, 48h)

≤2.0

0.93

Qualified

9

Combustion performance

Reach Grade B2

Grade B2

Qualified

10

Apparent density, kg/m3

----------

30

--------

(Blank below)

 

 

 

 

 

 

 

 

 

Remarks: the test method of the moisture permeability factor is the desiccant method and the sample thickness is25mm.

Address of inspection unit: North Building of China Building Materials, Guangzhuang, Chaoyang District, Beijing    Tel: 010-51164723   Postal code: 100024

 产品检测报告英文版ChinaBuildingMaterials Industrial Technology Supervision andResearchCenter

ChinaBuildingMaterialsIndustryCenterfor Quality Supervision and Inspection of Dry-mixed Mortar

 

Test Report

No.:201305AC132                                   Pages: 4/4

Sample Name

Extruded sheet

(Sample picture)

 

 

Remarks: (blank below)

 

Address of inspection unit: North Building of China Building Materials, Guangzhuang, Chaoyang District, Beijing    Tel: 010-51164723   Postal code: 100024

产品检验报告英文翻译,产品呢检测报告翻译模板,产品出口检测书必须正规分哪一机构翻译,改翻译,100元一张.

 

阅读这篇文章人的还阅读了以下文章

 

相关问答

  • 问:你们译员团队的资历情况如何?
    答:参见公司简介,或者译员简介,80%为硕士研究生或博士研究生,大部分译员均具有全国翻译专业资格(水平)考试二级以上证书,具备5年以上不同专业背景的翻译工作经验,笔译工作量超过500万字以上,口译工作量达每年50至100场大中型会议。翻译审校团队由从业10年以上的资深译员和外籍专家组成。
  • 问:长期协议如何签订?是否可以采取月结的方式?
    答:可以的。对于长期合作、信誉好、需求量大的客户,我们会安排客户经理上门签订框架协议,费用月结。
  • 问:我的需求很特殊,您能帮助我吗?很苦恼
    答:如果,我的服务不是您的需求,或者您有不一样的需求,苦于无法寻求答案您也可以联系我,我们一起想办法,只要跟翻译有关系,就可以问我,我的背后有全国翻译联合会,有几百家同行和各种不同语种、资源的翻译员都认识我(本公司经常在各种翻译会议作报告),或许就能帮助到您,这与是否达成订单无关,与金钱无关
  • 问:怎么理性看待翻译公司给出的报价?
    答:我们可以用笔译项目为例分析一下成本,生产直接成本:优秀的译员难得,现在满世界都是自称英语很好的人,包括很多专业八级,但翻译能做得好的人寥寥。物以稀为贵!项目管理和运营成本:好的项目管理和客服人员也是好的服务所必不可少的,他们能准确把握客户的需求,实施规范的项目流程,因此对他们的语言、沟通以及项目驾驭和软件使用能力都有较高的要求。 生产流程的每个环节要不折不扣地执行都会发生相应的成本,比如TEPQ(翻译+校对+编辑+质保),如果是通过翻译公司偷工减料缩减流程而换来的低价,最终损害的还是客户自己的利益。
 
  • 【理上网来·辉煌十九大】许志勇:以金融改革助力乡村振兴 2019-05-22
  • 丰田、通用、大众三巨头在华拼未来 汽车行业“新四化”成共识 2019-05-22
  • 看来“无名小卒也”这样的网民在公有制企业里有一大批,那么公有制企业一定会发展的快,搞的好,呵呵。 2019-05-21
  • 古镇灯饰企业为灯饰品牌化鼓与呼 2019-05-13
  • 香港旅游重现精彩前景可期 2019-05-13
  • 甘肃警方破获一起“微信卖茶叶”特大新型网络诈骗案 2019-04-29
  • 中国保险行业协会获第十二届人民企业社会责任奖年度扶贫奖 2019-04-29
  • 父亲节,你知道 有几成“男人装”? 2019-04-27
  • 【北京海之沃车型报价】北京海之沃4S店车型价格 2019-04-23
  • 个税法迎第七次大修 起征点调至每年6万元 2019-04-23
  • 端午小长假长沙6项目开盘 望城刚需盘均价4600元平 ——凤凰网房产长沙 2019-04-22
  • 新版IP定向--山东频道--人民网 2019-04-09
  • 我在吃饭,重点在那?重点在饭,难道我只能吃饭吗?看着就想笑 2019-04-09
  • [鄙视]江湖片子又脑残瞎举例了,尔幼稚到连“顺应民心就是人民主导”这个简单的道理都不懂?! 2019-04-01
  • 短评:事前多点通告 把“惠民工程”办到群众心坎里 2019-03-16
  • 958| 151| 654| 823| 275| 986| 375| 837| 875| 726|